how to calculate Tile skirting
Answers were Sorted based on User's Feedback
Answer / akrmsb
It is done by the formula 2(l+B)-deductions.
For example length of the room is 5 mts
and breath is 4 mts
then the qauntity of skirting will be 2(4+5)= 18mts.
from this subtract the deductions like doors.
if the width of the door is 1.2 mts then the final quantity will be 18-1.2=16.8 mts.
Is This Answer Correct ? | 99 Yes | 23 No |
above answer is correct. it is always calculate in rmt.
Is This Answer Correct ? | 33 Yes | 8 No |
Answer / akash choudhary
Yes it is absolutely correct it is measured in running meters(rmt)
Is This Answer Correct ? | 17 Yes | 3 No |
Answer / madhu
If you need a quantifier of tiles you should measure the length with measuring tape of skirting tile
For Eg: A house is having 200rft length skirting tile and tile size is 2ft *2ft, keeping 4inch as skirting tile width we get 6tiles from 1 tile so that formula is
Total rft of skirting tile / (1 tile length* No of skirting tiles from 1tile)=No of tiles
200rft/(2ft*6No)=16.667~17 no of tiles required
Eg 2: if tile size is 2ft*4ft for the same 200rft
from 1 tile we get 6 skirting tile keeping 4ft as length
200rft/(4ft*6No)=8.334~9 no of tiles required
In site conditions, 2ft*4ft tile comes in 2no in a box so that we mention as 4box and 1 piece required for skirting tiles excluding wastage percentage
Is This Answer Correct ? | 6 Yes | 0 No |
What should be percentage of silt content in sand?
What is the proportion of M 45 grade of concrete
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
how to calculate upthrust pressure of under ground water tank in wet soil?
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
How we can calaculate materials required for block work(1m3) block size 33cm x 20 cm x 17 cm, mortar 1:6
What is ideal location for cube casting, RMC vehical at Ground Floor and Slab casting at 40th Floor
wat is the proportion of M40?
What is pre-stressed concrete?
how can we calculate steel value, depending on load
Formula of mid span bar
0 Answers Modern Construction Company, PFPL,
form work including the props can be removed from beams only after