Providing and fixing in position Tor steel to footings,
foundation, slabs, beams, columns, canopies, stair case,
newels, chajjas, lintels, etc. including cutting, bending,
hooking the bars, binding with wires. give me the rate M.ton.
Characteristics of a model project are ––
what is rigid pavement
how to laying tarfelt on asbestos roof for leeks water?
what is the design procedure for building
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
0 Answers Alfanar, Ancon, RAZ,
what is the proportion of stones and concrete inplum concrete??
Which word is coolest among the 26 alphabets?
what is the meaning of W.T.S this is written on structural Drawing
What"s mean by term of BOQ in construction?
13 Answers Jaypee, Shaarc Projects, Xerox,
Please provide detail I.S standard code for using crush sand instead of river sand for plaster and concrete grade M15, M20, M25 and M30 and its mix design
what is the real de-shuttering time for rcc column,slaband wall
How we can calculate cement and sand for a wall 25ft x 28ft.Thickness of wall is 9inches.