Middle point of any slab is raised 10-12 mm during
shuttering work because––
Answers were Sorted based on User's Feedback
Answer / mughalsab
if i dont raised at mid ponit of slab so when we poured concrete then the slab is sag at mid point due to its own weight therefore we raised at mid point so when concrete is poured then the slab is going to its corect position.
Is This Answer Correct ? | 9 Yes | 1 No |
Answer / bharat gurav
because at middle point act point load & share force act at
L/4 so extra steel r provided...............but at mid-span
no provide extra steel due 2 sla raise 10-12mm
Is This Answer Correct ? | 1 Yes | 4 No |
which is cover of r.c.c. column,beam and slab
tell me quantitys of matal, sand and cement in 1:4:8 and 1:2:4
9 Answers AVL, Infosys, NCC, SPCL, Swapnapurti Developers,
25. Are you willing to work overtime?
what is mean by Face bar using in coloums?
how much used soil in 1 brick of standard size?
0 Answers Global Career Solutions,
What is the sugested procedure of water purification for public supply?
shuttering consumption per square feet in multi storeyed building?
How can we calculate quantity of slab, beam @ column ? Beam should be calculated by deducting slab thickness or slab should be calculate in to in ?
Whats the difference between uniaxial column
What is Shoe Footing ?
2 Answers Bhandari Associates,
why there is need to provide shear reinforcement?give the basic reason?
9 Answers JMC, L&T, Power Grid,
which type of materials should be used for framed structure???