dear all, How do i increase UPS (1000VA)backup time ? i
have connected 2 12v wold you please 120 aH battery
externally. ups charge the lead acid battery only 12.7 volt.
backup time only 10.00 minuts and gose off. can any one of
you help me?



dear all, How do i increase UPS (1000VA)backup time ? i have connected 2 12v wold you please 120 a..

Answer / waqasfarooqui22@gmail.com

1 kva ups is not. charging current 120AH battery therefor use to external charger use or calibratIoin. of ups or overload

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

if a number of plc s are there then how many modbus to be used

0 Answers  


What is meant by pitch of a synchronous machine.??

1 Answers   Kirloskar,


How many losses in generators? how we can reduce them? and also in motors,transformers?

1 Answers  


how to select a air/vacuum circuit breaker.is there any thumb rule???

1 Answers  


What happens if the Capacitive Voltage Transformer Primary neutral is not earthed. There is a CVT between Transformer and source, and the CVT neutral of the transformer is not earthed, does it effect the transformer while charging or does it effect the transformer charging process.

1 Answers  






An engineer measures the direct current resistance of a transformer using ohm meter. When he/she takes out one of the leads of the meter, spark comes.. Why ?? This effect is known as...

1 Answers   Saint Gobain,


Why in a three pin plug the earth pin is thicker and longer than the other pins?

18 Answers   LG, NTPC,


we have a rewind motor of 2Hp,2800Rpm, 220Volt AC. how can we choose the running capacitor for this motor, any formula for that?

0 Answers  


why induction motor take more current when motor start time and this current take for 1 hours when motor is start.

2 Answers  


In single phase ac ups supply when current is measured with tong tester neutral current is found more than phase current.What is the reason?

0 Answers  


i want to learn control schedule for 11kv panel? can any one send the detailed control schedule?

0 Answers  


what happens if DG N earthing fails while running and N Earthing fails while Transformer on load ???what will be the impact ???????/

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)