is it fair to recruit another prestressing agency once
earlier agency has provided guide cone for post stressing
the Concrete -I girders? It is observed that the bearing
plate of another agency is not matching with the earlier one
resulting in protruded strands after stressing from the face
of girder. Kindly advice.
No Answer is Posted For this Question
Be the First to Post Answer
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
what"s the cement, sand, aggregate(consumption) quantity for 10 cm thick roof slab (1:2:4)
Explain major differences between routing maintenance and major maintenance.
How much quantity water should be placed in one cubic meter area?
how can i calculate cement in brickwork
what is levelling staff least count
Which one is the main bar in a square slab (2m x 2m)
what does the track parameter mean in staad.pro?
What is difference between load bearing structure and frame bearing structure ?
2 Answers Sathiapal Engineers,
How to testing voids of filled aggregate in bitumen mix design
how much distance to provide lap lengths in footings,plinth beams, columns, beams& slabs
Can inverted beams used in pipes during construction?