is it fair to recruit another prestressing agency once
earlier agency has provided guide cone for post stressing
the Concrete -I girders? It is observed that the bearing
plate of another agency is not matching with the earlier one
resulting in protruded strands after stressing from the face
of girder. Kindly advice.
No Answer is Posted For this Question
Be the First to Post Answer
what are some possible sources of error in the CBR test?
In Rcc ratio calculation I wanted to know quantity of Steel also.
How much cement,sand,bricks and water needed for 1square metre brick work?
What is specific gravity???
WHY DID YOU CHOOSE THIS CARRIER?
What materials were used to build the golden gate bridge?
What is the use of offset command?
where i can get material costs on weekly basis
what is directivity effect?
How to calculate Volume of Wet cement concrete for a specific grade?
what is the ratio of m50 grade in concrete block
how can calculate cutting length of diamond ring
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)