Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


The MCB circuit breaker have a voltage rating of 440VAC it's
possible to supply a voltage of 480Vac



The MCB circuit breaker have a voltage rating of 440VAC it's possible to supply a voltage of ..

Answer / k.prakashchandra

Yes ,you can go up to 650V ,as most of them are designed for
1.1 KV

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

why h parameter are called as hybrid parameter?

0 Answers  


What is meant by "tampering detection" of a electrical energy meter?

3 Answers  


how moving coil indicator works?

1 Answers  


What are the causes of eddy current losses?

1 Answers   Schneider,


Why mostly GT(Generating Transformer)has only Ynd1 Vector Group?

1 Answers   Essar,


how to check the continuity of a cable with a megger

4 Answers   Metro,


Why smallest capacity LV motor are star connected and medium & bigger size LV motors are delts connected

1 Answers  


11 kV line deraction check by an Engineer.

0 Answers  


How the main bus bar rating of 400kV switchyard with one and half breaker scheme is calculated.

2 Answers  


I did oil BDV test of 1600 KVA trafo 20KV/400V as per IEC 156. Result is 1) 58 KV 2) 58 KV 3)40 KV 4) 50 KV 5) 58 KV 6) 18 KV. Avr is 47 KV. Can we say oil is still ok even in the 6th test BDV is 18 KV ?

1 Answers  


why inverter rating is in KVA

3 Answers   Alstom, JSW,


in thermal power plant the steam produced is made to cool after falling on the turbine blades. my question is why this is done while the same is needed to heat up again. "jab pani ko wapis garam hi karna hai to thanda kyu karte hai"

11 Answers   Bhel,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)