Power grids in two adjacent states(A&B) are interconnected.
Can power grid in state A can be represented by Thevenin
Equivalent Circuit. If not explain Why?
No Answer is Posted For this Question
Be the First to Post Answer
difference between ordinary portland cement concrete strength and pozzolona portland cement concrete strenth
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
What are the deshuttering time for Salb Beam Column RCC Wall Footing Staircase
What is Well Point System in Dewatering
how you calculate the qty. of cement ,sand,aggregate from proportion 1:2:4 M15
iam constructing a new hall of size 21'*14'. we r constructing without columns...i.e only with basement..and constrcting wall thickness of 9" only...can I laid slab on these walls? is it safe?
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
0 Answers Talib and Shamsi Constructions,
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
wat is the quntities of cement and sand for 10msquer wii plastering for 10mm tick
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)