What are some good estimates for heat transfer coefficients
for coils in tanks?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Chemical Engineering Interview Questions

what is AZ431 & how to check it by using multimeter?

0 Answers  


what is extractive distillaion

6 Answers   ONGC,


What chemical is used to expand air bags in such a short amount of time?

0 Answers  


Dielectric materials in static fields

0 Answers   HCL,


how to improve recovery of product in packed tower(raising ring) recovery of vinyl acetate from VA+WO ( vinyl acetate +waste oil mixture)

0 Answers  






Question 110 - When an algebraic product is defined on the space, the Lie bracket is the commutator [x,y] = xy - yx according to Lie algebra in mathematics. If [p,x] f(x) = px f(x) - xp f(x), p = -ih d / dx, find the value of [p,x] in term of i and h.

1 Answers  


how much maximum power can be generated by 320v, 10kg-cm synchronus motor if shaft is roteted mechanically at 50 to 60 rpm?

0 Answers  


who is your present and most resent employer?

1 Answers  


what three specific job positions do u target from the company.

2 Answers   Amec Foster Wheeler, Chevron, Exxon Mobil, Petrochemicals, TCS, Texaco,


MASS TRANSFER - EXAMPLE 4.1 : A concentric, counter-current heat exchanger is used to cool lubricating oil. Water is used as the coolant. The mass flow rate of oil into the heat exchanger is 0.1 kg / s = FO. For oil, the inlet temperature TIO = 100 degree Celsius and the outlet temperature TOO = 55 degree Celsius. For water, the inlet temperature TIW = 35 degree Celsius and the outlet temperature TOW = 42 degree Celsius. What is the mass flow rate of water in kg / s, FW needed to maintain these operating conditions? Constant for heat capacity of oil is CO = 2131 J /(kg K) and for water is CW = 4178 J /(kg K). Use the equation (FO)(CO)(TIO ?TOO) = (FW)(CW)(TOW ?TIW).

1 Answers  


How can one estimate how the friction factor changes in heat exchanger tubes with a change in temperature?

0 Answers  


MY generator water cooler inlet line height - 11 mtr inlet water line height - 7 mtr water come into the line from overhead tank, O/H tank height - 20 mtr the first tapping in the inlet line is 2" line which down to 4 mtr level plateform., second tapping in inlet water line goes to a pump 6" line installed at 4 mtr level plateform, pump capacity 200m3/hr, head- 30 mtr, hp-40. the outlet of pump of 6" water line connected to a header of 6 mtr long of 6" line, on this header the six tapping are connected, 4 nos. 3" line goes to 11 mtr height water cooler the pressure of the line is 0.15 to 0.25 kg/cm2, 2" and 4" pipe line connected to a cooler at 4 mtrlevel plateform. my question is, at 11 mtr height level the quantity of water and flow is not sufficient for my cooler, the temp. of cooler is rises much more. you are requested to suggest the modification of pipe line/ pump for take more water flow and pressure (desired pressure is 1 kg/cm2)

0 Answers   Simbhaoli Sugars,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)