Can anybody tell me how to calculate the quantity of a
trapezoidal footing?With its formula and an example.

Answers were Sorted based on User's Feedback



Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / raju

Right formula is = V = [L X B X d] + h / 3 [ A1 + A2 + ROUTE
UNDER A1 A2 ] where , l = length , b = breadth , d = bottom
depth , h = D - d , A1 = bottom area , A2= top area (ii) is
= V = [L X B X d] + h/6(A1 + A2 + 4 Am) where , h = D - d ,
A1 = bottom area , A2= top area, Am = Mean of Top and Bottom
Area


feel free to call me
Raju
Engineer-Civil
9999213613
DLF

Is This Answer Correct ?    60 Yes 3 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / s.prabhu

above said is correct answer

Is This Answer Correct ?    14 Yes 4 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / raja j

in trapezoidal footing we seperate the footing as two
parts.one is rectangle another is trapezoidal

for taking rectangular portion= (L*B*d)
L=length of footing
B=breath of footing
d=footing depth (at the end of rectangle portion height)

for taking trapezoidal
v=h/3((A1+A2)+sqrt(A1A2))
V=volume
A1= footing area (L*B)
A2= column area+ add 50mm for each side ((l+100)+(b+100))
h=height difference(D-d)
finally,
Add =rectangle+trapezoidal
= (L*B*d)+h/3((A1+A2)+sqrt(A1A2))

Raja.j
9626389621

Is This Answer Correct ?    9 Yes 5 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / jigar soni

V = [L X B X d] + h/6(A1 + A2 + 4 Am) where , h = D - d , A1
= bottom area , A2= top area, Am = Mean of Top and Bottom Area

Is This Answer Correct ?    5 Yes 1 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / s.prabhu

Please divide the footing in to 2 parts i,e 1) Bottom
rectangular portion & 2)top slope portion
Total volume (V) = v1+v2
Volume of bottom / rectangular portion is called as Volume
(v1)

Volume of top / slope portion is called as Volume (v2)

V1 = L1xB1xh1

V2= h2/3* (a1+a2)* square root of (a1+a2)

L1= length of bottom portion
B1= breadth of bottom portion
h1 = height of bottom portion
L2 = length of top portion
B2= breadth of top portion
h2 = height of top portion
a1= area of bottom bottom Portion = L1*B1
a2 = area of top rectangle portion= L2 *b2

For any clarification
Please call
S.Prabhu
9901702081

Is This Answer Correct ?    7 Yes 4 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / krishna kumar.a

Quantity = 1/6*(top area+bottom area+ 4* mean area)
Example
top length =3m, width =2m
bottom length =5m , width =4m
height =1m
Top area =3*2 = 6 sqm
Bottom area = 5*4 = 20 sqm
Mean area =(5+3)/2*(4+2)/2 = 12 sqm
Quantity = 1/6*(6 + 20 +4*12)= 12.33 cum

Is This Answer Correct ?    9 Yes 7 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / sekar.k

QUANTITY CALCULATION FOR TRAPEZOIDAL: 1/2*H(A+B)*L

EXAMPLE:FOOTING TOP WIDTH:2.00M
FOOTING BOTTOM WIDTH:4.00M
FOOTING HEIGHT :6.00M
FOOTING LENGTH :10.00M THEN,
QUANTITY OF TRPEZOIDAL FOOTING :

1/2*H(A+B)*L

1/2*6.00(2.00+4.00)*10.00

1/2*6.00(6.00)*10.00=180.00CUM

Is This Answer Correct ?    5 Yes 4 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / madhu sudhan p

h/3xa1+A2+(SQRTa1xA2)

Is This Answer Correct ?    6 Yes 5 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / nadim

divide into 3 parts 1st into 2 traingles and 1 into a rectangle we all know the area formula then multiply the area with the remaining dimension

Is This Answer Correct ?    1 Yes 12 No

Post New Answer

More Civil Engineering Interview Questions

1.WHERE THE SLAG CEMENT IS MAINLY USED. 2.FOR GOOD CONCRETE MIX OF M20 GRADE , CAN IT BE USED? 3. I WE USE FOR BRICKWORLiK AND PLASTERING ANY DISADVANTAGES?E

2 Answers  


What is the difference between engineering stress and true stress?

0 Answers  


undisturb samples are obtained by direct excavation thin walled sampler thick walled sampler none of this

1 Answers  


Discuss some applications of modular elasticity?

0 Answers  


What is mean concrete class c35/20. Here C35 and 20 means?

10 Answers  






why demand factor less then 1 ?

0 Answers   Simplex,


What will be the crank length in an staircase is same like an slab?

1 Answers   EIT,


Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?

0 Answers  


why moment is create in fixed beam. And why moment is not create in simply support beam

4 Answers  


how amny bricks of size 240 mm X 120 mm X70 mm are required in 100 cubic meter brickwork. How much cement is required at 10 mm masonry and at 4:1 sand cement ratio and how much cubic meter of sand is required for the above work.

2 Answers   Cube Construction,


What is the deffrence multistory bulding &highrise bulding

1 Answers   BLK,


The concrete slump recommended for beams and slabs; is?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)