stub column means..

Answer / modipraveen

Stub column is one which does not hav footing & Pedestal
support(Reinforcement), which is rises from Beams or Slabs
for upper levels... and also know as floating Columns

Is This Answer Correct ?    41 Yes 5 No

stub column means..

Answer / ajay kumar singh(jrc)

jaise kisi ped ke mote tane se koi shakha nikalta hai use
stub ped kahate hain,usi tarah kisi stucture me kisi beam
se koi column nikalta hai use stub column kahte hain.

Is This Answer Correct ?    24 Yes 1 No

stub column means..

Answer / manikanta73

known as floating columns which rests on beams that doesnt have foundation

Is This Answer Correct ?    14 Yes 1 No

stub column means..

Answer / jitender kumar mishra

stub column is start the roof salb or beam

Is This Answer Correct ?    17 Yes 8 No

stub column means..

Answer / dhanasekaran

Its rest below the ground level and combined with footing

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

what is gunter's chainm. what is yhe number of links in chain. and 1 link shows what distance

1 Answers  


what is water cement ratio m10,m15,m20,m25,m30,m35,m40

1 Answers   Quaid-e-Azam International Hospital,


How many cement mortor dry quantity required for 1m3 ?(1:4)

3 Answers  


i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?

0 Answers  


what is the density of Coarse Aggregate in 1 cu m of Concrete?

7 Answers  






Soil is clay

2 Answers   L&T, NBCC,


how many bricks are required for masonary trench having length of 31 mtr, depth of 0.6 mtr and breadth of 0.45 mtr on single brick work as well as double ( 9" ) brick work

5 Answers   IEC,


For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.

0 Answers  


how do we calculate quantity of gypsum for 1m3? 1m3 = ?kg

2 Answers  


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

0 Answers  


Why can i adopt concreting insted of rubble solling in beds? In comoarision concreting is cheaper than the soling.

1 Answers  


shuttering consumption per square feet in multi storeyed building?

6 Answers   L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)