what will happen if a 3 phase motor is connected to a single
phase circuit and vice versa?
Answers were Sorted based on User's Feedback
Answer / ganesh shelke
if 3 phase motor connected to single phase supply ,single
phasing happen in motor and motor will take high current
.3pphase motor require 3 phase supply for producing roating
magnetic field.so do not connect 3phase motor to single phase
| Is This Answer Correct ? | 13 Yes | 1 No |
Answer / karthik
a 3 phase machine is used for high power application and the rotating magnetic field is created by the 3 phases hence when it is connected to a single phase supply we will not be able to create a rotating magnetic field unless the field is connected along with a capacitor or inductor to create a phase difference. but whena single phase machine is connected because of the inherent phase lag between the various phase of supply.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / n.k.singh
If single phase 230 V is available then motor will not
start.
If single phase 440 v is availbale then also motor will not
start.
| Is This Answer Correct ? | 1 Yes | 10 No |
why do transformer humm ??????????
What is D check in a Diesel generator for 1000kva DG
what perpose of use CT ratio in gt,st,uat
An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.
If load is 240 kw & pf is 0.8 lagging, than how to increase it from0.8 to 1.0(unit),which rating capacitor used, please give me Calculation. What is effact of consumer & suplier if pf is lagging or leading with on effect machines/ TF/GE etc.
what is difference between inductive and reactiveload?
why vector group is ued
Star Delta Diagram with full description
0 Answers SKS Microfinance, Syscom,
A IS TWICE AS GOOD A WORKMAN AS B AND TOGETHER THEY FINISH A PIECE OF WORK IN 14 DAYS.THE NUMBER OF DAYS TAKEN BY A ALONE TO FINISH THE WORK IS 1.11 2.21 3.28 4.42
WHY AREWE USING THE 3 1/2 CORE CABLES IN POWER TRANSMISSION
1 Answers Phoenix Technologies,
How to measure the earth resistance value in a concrete pavement(flood light area)?
IN 3 phase induction motor where we give i/p supply & how its working ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)