Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


NAME ANY TWO PHOTO CONDUTIVE MATERIALS?



NAME ANY TWO PHOTO CONDUTIVE MATERIALS?..

Answer / guest

LEAD SULPHIDE,LEAD SELENIDE

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Instrumentation Interview Questions

Describe all types and levels (4-20mA, 0-10V, mV, pulse, etc.)of analog and digital I/O used in process control application.

2 Answers   Jindal,


How many ohms are required for proper earthing?

0 Answers  


what is the procedure for auto tune in masoneialn 12300 series displacer type transmitter?

0 Answers  


Draw a 3 element level control loop and explain

1 Answers   CCIE,


So I'm a first year apprentice and I'm having a tough time with knowing the difference between AI, AO, DI, DO. I'm having a hard time understanding what devices are which and why. Can someone explain this to me?

2 Answers  


Instrumentation symbols interpration, P& ID, Logic diagram analysis, Electrical drawing analysis.

0 Answers   CCIE,


what are the sensor types of vibration&speed?n what is proximity sensor?

3 Answers  


is fan is a transducer or inverse transducer?

5 Answers  


WE ARE HAVING YOKOGAWA CENTUM CS 3000 DCS, 2 FCS AND 4 HIS " When the operation Download to HIS message appears: Equalize start. HIS0163 WARNING: Could not connect to equalize destination. (7001) Retrying. Number of retries = 0/1 ERROR: LdXopsLoadMain: connect error 10060 ERROR: LdXopsLoadMain: connect error 10060 ERROR: Processing terminated due to connection error. (7002) Equalization end with errors. HIS0163 ---- ERROR = 3 WARNING = 1 ---- Tell me, please, why and how to solve the problem."

6 Answers   Khas Pvt Ltd, Yokogawa,


Why grounding is necessary? Give example with diagram.

0 Answers   Bright Point, DS Group,


How the flow can be measured by using DP Transmitter?

3 Answers  


Please tell me details about Sox,Nox,SWAS analyser????

0 Answers   Essar,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)