Outline ten different ways in which typical bill of quantities
can be used?
Answer / shanthi mary
1. For tender
2. Work order
3. Budget preparation
4. Scheduling the activities with BOQ
5. Planning for materials
5. Planning for Labours
6. Planning for Money and machineries
7. Sub-Contractor billing (executed quantities against BOQ)
8. Client billing (executed quantities against BOQ)
9. Material reconcilation
10. To highlight the slipages in each activity in BOQ
Is This Answer Correct ? | 11 Yes | 0 No |
uses of M50 and M60 grade ordinary and pozzolona portland cement concrete?
what is the weight if 1m3 M25 concrete after setting?
why we used shahabad stone (ladi) in box type water proofing.what is the main roll of shahabad stone?
how much grade of concrete can be used for different structural element such as slab,beam,column,footing & plinth beams? and type of cement can be used in construction work & also types of cemnt grades
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
what is the percentage of silt in black cotton soil.?
what is mean by centrifugal force which is act in vehicle on superelevation of road?
how much % of cement can be replaced by flyash ....
While painting,if the gypsum is the first coat to seal holes on wall,It said to have tendency get away with all other coat. What is the solution on that?
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
Using 1 lit paint how many sq.ft of wall we can paint. Thanks.
How do you to separate Marble and Granite. What are difference between them?