Which of the following are the important limitations of rod
gap surge arresters?
1. They are not capable of selling off power frequency
follow up current.
2. After a discharge, the rods are destroyed completely.
3. Performance is affected by climatic conditions.
Use the following codes for selecting the correct answer.
Codes:
(a)1, 2 and 3 (b)1 and 2
(c)2 and 3 (d)1 and 3
what is meant by Back emf ?where its occur ?
my 10 hp submersible pump is tripping when connected through ELCB.I have checked the megger value of the coil's with body.It was found to be 0.2mega ohm.that is leakage is there.But when connected to mccb it is not tripping.no leakage current in the motor.Is it safe to connect to mccb? what are the problem's will arise if future?also tell me in ELCB no neutral is connected to motor.than how ELCB was working?
IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace.
What is Hot reserves and spinning reserves?
WHAT IS THE THUMB RULE FOR DECIDING THE CURRENT RATING OF COPPER WIRES SAY 2.5/4/6/10 MM SQUARE SIZES??
14 Answers Dubai Group, Saudi Delta Groups, Savitha Electricals,
. Draw the vector diagram and condition for the following: 1) Dyn1 2) Ynd0 3) YnYn0
armature winding of dc machine produce alternating emf then it convert in to dc by using commutator.But only we consider armature resistance why don't we consider inductive reactane effect?
can we coorect P.F. OF 320 KVA ALTERNATOR AT LOCAL SITE WITH RATED .8 PF LAGGING.
what is the difference between active power and reactive power and apparant power in practical as well as theoritical
why maintenance batteries used in DG sets not in MAintenance free Batteries.
What is the role of link in neutral in a three phase ac system?
Why Power generation in India is at 50Hz while in America its 60Hz so is there any advantage/Disadvantage of this ??
38 Answers Australia Visa, College School Exams Tests, Fiat, InfoPlus, L&T, NTPC, TCS,