what is the minimum compressive strength in 7 days for
m20,m25,m30
Answers were Sorted based on User's Feedback
Answer / gulshan kamboj
it is 67%. but practically should varies between 70 to 75%.
| Is This Answer Correct ? | 6 Yes | 4 No |
Answer / aijaz hussain, modi builders
Mix 7 Days compressive strength
M20 175 kg/sq.cm.
M25 210 kg/sq.cm
M30 365 kg/sq.cm.
| Is This Answer Correct ? | 9 Yes | 9 No |
in 7 dayas 70% min. compressive strength required
| Is This Answer Correct ? | 4 Yes | 12 No |
i want to know the easy way to find the quantity of steel in a slab , coloumn
What is Purpose Of Stirrups give In Beam ?
what are the tests conducted on cement,aggregate and concrete?briefly explain that tests procedure and limits adopted for safety side.
what course did you consider thinking before you enrolled in college?
how the sand fail?
what is the cut length for Fe 500?
what would be the rqmnt. of cement and sand (1:6)for building brick wall and also 20mm thick plaster on the wall by same ratio?
can anybody suggest me or rather send me tutorial of staad pro..iam in real need..thanks..id is:-ankit99991@gmail.com.
How the reconcilation of the steel can be done?
3 Answers IL, JMC, JMC Projects, Simplex,
Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,
What is pre-stressed concrete?
what are the differences between Tie beam, Ground beam and strap beam. thanks
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)