how to calculate the dry wt of sand and cement for a
required design mix?for ex:M20
No Answer is Posted For this Question
Be the First to Post Answer
you are planning to paint a newly fabricated workshop building made of structural steel of 10 tons total mass.you are require to paint 1 cot of primer and 2 coats of top coat.How many liters of primer and top coat you will request
What is absolute pressure? How absolute pressure is calculated?
Dear Sir What is the Contraction joint for base Slab
What is the quantity of steel, cement, sand, and aggregate required for a 2100 sq ft Roof Slab(Residential Building) area of RCC?
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
What is the difference between RCC & PCC?
why only water cement ratio always......why not water sand ratio while making concrete
rate analysis of shuttering
Forces in a Shear Wall are in plane or out of plane ?
How much quantity of water required for curing of: 1) For concrete of 10cu-m or 10sq-m 2) For blockwork of 10sq-m 3) For plastering of 10sq-m
How to design staircase.plz tell me formula for the design the staircase.
In which direction is bottom bar of rectangular footing is placed in short or long.