i am going to give the JSEB,RANCHI exam for power plant,so i
need some samples of papers related to that,so please send
me these papers by my mail id.
No Answer is Posted For this Question
Be the First to Post Answer
air condition capacity for masjad having 50feet in circal and 35 feet high
WHEN TWO ALTERNATORS ARE OPERATING IN PARALLEL, EXPLAIN WHY IT IS OBJECTIONABLE TO OPERATE ONE AT A LEADING POWER FACTOR AND ONE AT THE Lagging power factor?
Between Turbo alternator and Hydro alternator which one is more difficult to cool and why?
Explain working of servo controlled voltage stabilizer.
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?
what is meaning of 230volts ac 50hzs ac supply is it rms or maximum to getting ac 230v what amount of max voltage they will send
WHAT DO U MEAN BY THERMAL OVER LOAD RELAY& WHERE THEY ARE BUSED
in a solar power plant,we are going to step up the voltage 350V to 33kv, and to 132kv GSS. i want to ask that if it is possible that 315v/33kv is not possible because we also use 315v/11kv. or it should be 415v/33kv? is it effects generation or losses? the second question is-generation is depends on LV winding? or LV winding design for generation voltage?
what is meant by impedance testing of transformer and why it is used
Getting nusense tripping in a 11KV soft starter, have checked all it control supply & contactors but did not get any fault please help.
Does VT metering core can be used for synchronizing.
1 Answers Shrishti Power Technologies,
How much load can be taken for chiller from 1500 kva transformer