Please clarify,
1. Is it required to lay two runs of GI wire along
with Armoured LT cable if it is laid between one big mains
(63Amps TPN SDF) to small main (32A TPN SDF) with proper
glanding termination?
2. If the armoured cable with proper glanding is laid from
DB to CNC machine, is it required to run two runs of body
earthing to the Machine from DB?
3.If the armoured cable with proper glanding is laid
from Substation to Hangar, distance is approx. 100 mtrs, is
it required to do earthing at shop area though the primary
termination at substation is earthed through gland.
No Answer is Posted For this Question
Be the First to Post Answer
what is the principal of ceiling fan and how it will rotates? what is the magnetic momentum produces inside the fan?
how many by pass system in online UPS.
what effect on electrical equipment if PF is gone over 0.996 in leading when provider say that its keep in minimum 0.996lagging
how to calculate maximum current
0 Answers Almeer Technical Services,
at work we have a 3 phase motor but on testing one phase isnt getting a reading. it runs 24 hours a day all week. stops and starts well no noise or heating. the phase isnt down to earth.is it just a bad meter reading or not? phases one and three came up with a resistance reading of 0.4 but phase 2 couldnt get anything shows up as open circuit.
define bilateral network and unilateral network? give an example.
list of tests to be carried out at manufacturers end while purchasing a step up transformer of 11kv to 66kv ,2MVa Capacity.
Why no-load primary current is very small as compared to full load current in transformer (as 1% of full load current?
How PADO software increase the efficiency of power plant?
Define norton equivalent circuit?
what is the effect of change in supply frequency on load angle of synchronous motor,all other parameters remaining same?
single sphase energy meter measur