what is meant by impedance testing of transformer and why
it is used
Answer / maheswar prusty
Impedance test is known as short circuit test,from this
test we get the full load copper loss.In this test low
voltage winding is always short circuited and
measurementare should make at the high voltage side.
Is This Answer Correct ? | 15 Yes | 5 No |
how the transmission voltage ranges are decided like 11kV,33kV,66kV,132kV,220kV,400kV,725kV.... why not choose the transmission line voltage as 23kV,164kV,440kV?? what's the reason??
If the field winding of the dc shunt motor is removed then what will happen to the motor ? will it turn or not
What information we need to prepare relay coordination chart
why we use copper earthing for neutral while for body GI.
1 Answers Chennai Metro Rail Limited CMRL, Valeo Lighting Systems India Private Limited,
WHAT IS ELECTRICAL MAINTAINTENCE ?
what happen if we give square wave instead of sine wave to the transformer
why neutral and body earthing of transformers kept separated? what is distance between two is required as per is?
why should we connect the no load components in a equivalent circuit of transformer in parallel?why cant it be in series.
why transformer rating is given in kva?
What will be the capcity of 3 phase DG set require for 25 KVA single phase lighting load?
what is breaking capacity
Ho de we calculate the line loss of a 500 kv line over 1000km.