i am completed in B.E(Electrical and Electronics Engineering)
with 8 months experience in Quality Control Engineer at
Bharathi Industries,Coimbatore.
No Answer is Posted For this Question
Be the First to Post Answer
IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace.
hi friends can u tell me name of the sites where i can get animation of electrical machines......
why we are not earthing ht cable at both the ends(sending & receiving end)?
I want to know the principle of rotating flux transformer.
Which type of motor is used in trains, what is the rating of supply used explain working principal?
If the field winding of the dc shunt motor is removed then what will happen to the motor ? will it turn or not
wath is this mining of dg
Explain UPS
What are the details of ratings of different types of ACSR conductors?
What is the advantangeous over SFU (switch fuse Unit) & FsU (Fuse Switch unit) which one is better & application of Both?
WHAT ARE THE DISADTAGES OF SINGLE-WIRE-EARTH-RETURN SYSTEM USED FOR RURAL ELECTRIFICATION?
What makes the difference between 50Hz supply and 60Hz supply which one is economical? What is the use of using increased frequency?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)