How many kilograms of sand required in cufic feet for one cubic meter of M25 grade concrete ..

Answer / himanshu

10.1706048 sq feet need in one meter qube

Is This Answer Correct ?    5 Yes 2 No

How many kilograms of sand required in cufic feet for one cubic meter of M25 grade concrete ..

Answer / ankem naga venkata manikantha

sand weight varies due to different grades and it depends upon its specifi gravity and its normally ranges from 1450 to 2082 kg/m3

Is This Answer Correct ?    2 Yes 0 No

How many kilograms of sand required in cufic feet for one cubic meter of M25 grade concrete ..

Answer / devineni srinivasa rao

sand for 1 cumt concrete 0.48cu mt
s.g of sand 2200kg/cu
sand .48x2200 -

Is This Answer Correct ?    0 Yes 1 No

How many kilograms of sand required in cufic feet for one cubic meter of M25 grade concrete ..

Answer / vijay patel

937.5kg sand per m3of m25

Is This Answer Correct ?    0 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

 Which Types Of Bricks ? 

0 Answers   Assotech,


what is irrigation

2 Answers   Era Infra Engineering, Prothious,


you are a civil engineering student so what you have done to improve your knowdge

8 Answers   Infosys,


If drainage is main things then which respect the super Elevation may be provided?

4 Answers  


where do Tie beams used in foundations?

1 Answers   Architects,






what is difference between tor steel & TMT STEEL?

5 Answers  


You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.

0 Answers   NCTC, NTPC,


the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C

0 Answers  


I've one slab of 24m x 43m. How to calculate required steel For this slab.

5 Answers   Reliance,


Why are pull-out tests performed for soil nails?

0 Answers  


what is the difference between volume and weight batching and which is better?

2 Answers   ECCI,


Whr should a joint be located in a beam if the provision of a joint is unavoidable??

2 Answers   BMTC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)