Please tell me about surveying standard chain details.Thanks.
Answer / dalip kumar
20m , 30m chain are usely used, in which one link of chain is 20cms i.e. 20m chain contains 100 links including there both hadles.
Is This Answer Correct ? | 7 Yes | 0 No |
13. What are your expectations from this possible relocation to our company?
How to convert aggregate and sand from kgs to ltrs ?
what is meant by velocity & gravity ?what is the difference between normal liquid flow & gravity liquid flow ?
WHICH ONE IS THE ECONOMICAL CONSTRUCTION SOLID BLOCK CONSTRUCTION OR BRICK CONSTRUCTION?
What out turn civil works
What is labour ratio for construction of residential buildings
why cylinder for split tensile strength test ?
state the functional requirement of a retaining wall
pls give the grads of concrete and the ratios to the same
how much shouid be the rate for ready mix concrete per cubic meter
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
How many modular bricks are required for 1 cubic meter of brick masonry?
14 Answers ITI, L&T,