Is it required to lay GI wires along with GI/MS conduits
from one point to another point though separate earthing
cable is conncted from DB to Socket?
No Answer is Posted For this Question
Be the First to Post Answer
why is a earth pit 10 ft usually? And, what should be the distance betweeen two earth pit?
How to find earthfault location in long cable layed underground or outside.
what is the difference between 2 way and 4 pole selector switch???
EXPLAIN WHAT BTU STANDS FOR(AIRCONS)
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
i have a 1500kVA transformer what is the kWH meter i need to use?
0 Answers HP, L&T, Mohammed Harasani Architects,
Why LVDT have secondary windings connected in differential 1. Higher out put 2. Based on the out put voltage-/+, helps to identify the direction of displacement 3. To establish a null/ reference point
How to calculate the electrical load for a standard telecom BTS shelter and capacity of DG set required to cater to this load?
3 Answers Bhel, INDUS, Indus Towers,
how to find ratio of CT & PT in 66/11kv 12 mva supply system ? explain with calculation.
How can we check ELCB trip current sensitivity How can we check earth resistance value
why US countries maintains 110v and 60HZ
i want to put single phase load on scott connected transformer,eventhough how to balance the transformer.