what are the Task work of different labour.?
No Answer is Posted For this Question
Be the First to Post Answer
Why should appointment store person for project ? what is the benefits for company ?
limit value of bulking of sand
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
Under what circumstances should pot bearings be used instead of elastomeric bearings?
what is the procedure of plastering..?
Test procedure of fly ash bricks as per code ?
What kind of soil has what bearin for pile work? eg sand with high water table collapses faster, black cotton soil is ideal, sand leads to more wear and tear of the boring consumables, rock takes longer and require rock augers etc etc
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
Sir I am from jntuk R13 regulation...... Is there any chance to leave credits
How much is anchor length ?
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
what is the logical concrete mix design for M 30 Grade and the cement consumption per M3
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)