what are the Task work of different labour.?
No Answer is Posted For this Question
Be the First to Post Answer
pl.may i place dry mix in casting of drain bed partialy filled with water?if no pl explain.
What is the use of extend command?
what is the compresive strength of m20 concrete at 7 day
RCC colums of 15"X9" each, roof height 10.5'ft, total pillars 12 nons. Span between pillar to pillar is 14/20/20 length wise and 17/14 width wise. Total Slab area 2400 sft and plinth area is 1900 sft. beams are 12"X12". kindly calculate load factor per sqft.
2 Answers ABS Construction, L&T,
DESIGN PROCEDURES OF R.C.C ELEMENTS
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
how much cement and sand required for 1cum rr masonry
How can effect the Floor tiles if water absorption value is higher than 0.5%?
what is education Cess.
What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?
Difference between ton and metric ton
how to calculate the quantity of steel used for construction..