Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


which one is the most common system for secondary ditibution



which one is the most common system for secondary ditibution..

Answer / arshad.dullah

440/230v 3 phase 4 wire

Is This Answer Correct ?    5 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

What is plc and how to do preventive maintenance

1 Answers  


what material is used in capaciter

0 Answers  


Sir, plz tell me how droop setting is done in parellel operation od DG set ? please give practical example ?

0 Answers   Honda,


How we select the vector group of 3phase power transformer?

0 Answers   wbsedcl,


How to design inductive load for 3 phase 440v and maximum 5 amps for star or delta? Can we use a 15kW, 1450rpm motor for 15kW, 960rpm apllication?If yes.how......n.if thesame motor used what`s it`s sideeefect.

0 Answers  


what is diffrence between MH LAMP and HELLOZEN LAMP

1 Answers  


what will happen power cables laid without gap in underground

1 Answers  


What is the basic principal of Diesel genarator?

3 Answers   Juniper Networks, MRF,


11KV electrical line going through the forest in cloudy night ,how can we find the direction of line.

5 Answers   Bhel, Cesco, HZL, Nesco,


low voltage distribution is done by a)3 phase 3 wire b)3 phase 4 wire c)single phase

3 Answers  


what is the pperating squvance in transmission line for circuit braker, isolater & earthing switch.

2 Answers  


sir,in our plant we r using SATEC PM172E power reading meeters in HT panel side it is monitoring the MB data smart viewer(sever).but last one week we did not get readings inthe server only available in meeter.tell me how communicate meter and server. and also what steps we take for checking.

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)