Which companies are into the project management of
construction of power transmission line?
Answers were Sorted based on User's Feedback
Answer / abhinav pathak
Transglobal Power Limited, L&T, Asian Fab Tech
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / k.prakashchandra
ABB,ETA B'lore,Deepak cables ,TCS,L&T etc
Is This Answer Correct ? | 0 Yes | 1 No |
two parallel conductors are carrying the current in the same direction.which of the following statements is true? (a)there is arepelling force between the conductors (b)the force increases when the distance between the conductors is increased (c)there is an attaracting force between the conductors (d)the force increases when the distance between the conductors is decreased
WHAT IS MVA RATING OF KOTHAGUDAM THERMAL STATION POWER TRANSFORMER?
12.5 tons a/c is their how much kva generator can recommend to the customer.
What kind of earthing method can be useful for ships and boats ?
how are reversing the direction of rotation of dc motor
Which standard i will refer for size of earthing conductor for equipment? (Eg:415V Switchgear, MCC, DB shall be 50x6mm GI flat)
what is Electrical BMS
what will happen reduce the transformer voltage from 415v to 406v, is it save the energy,? are this methodis good to reduce the energy.?
What are RMU yard Safety Operating Procedures
What is ELR, and where it is used ?
An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.
aeroline vibration is present