Which companies are into the project management of
construction of power transmission line?

Answers were Sorted based on User's Feedback



Which companies are into the project management of construction of power transmission line?..

Answer / abhinav pathak

Transglobal Power Limited, L&T, Asian Fab Tech

Is This Answer Correct ?    0 Yes 0 No

Which companies are into the project management of construction of power transmission line?..

Answer / k.prakashchandra

ABB,ETA B'lore,Deepak cables ,TCS,L&T etc

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

two parallel conductors are carrying the current in the same direction.which of the following statements is true? (a)there is arepelling force between the conductors (b)the force increases when the distance between the conductors is increased (c)there is an attaracting force between the conductors (d)the force increases when the distance between the conductors is decreased

1 Answers  


WHAT IS MVA RATING OF KOTHAGUDAM THERMAL STATION POWER TRANSFORMER?

2 Answers   CESC, Power Grid,


12.5 tons a/c is their how much kva generator can recommend to the customer.

0 Answers  


What kind of earthing method can be useful for ships and boats ?

0 Answers   GE,


how are reversing the direction of rotation of dc motor

0 Answers  






Which standard i will refer for size of earthing conductor for equipment? (Eg:415V Switchgear, MCC, DB shall be 50x6mm GI flat)

1 Answers  


what is Electrical BMS

3 Answers  


what will happen reduce the transformer voltage from 415v to 406v, is it save the energy,? are this methodis good to reduce the energy.?

0 Answers  


What are RMU yard Safety Operating Procedures

2 Answers  


What is ELR, and where it is used ?

7 Answers   KSEB,


An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.

0 Answers   UOG,


aeroline vibration is present

1 Answers   DVC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)