Answer / h r jadhav
when line voltage 480 is used across the primary of step
down trf having secondary is 230 volts then 1 phase motor
will load same current to lv side however it will load the
primary with respect to tf ratio. so if u have tf rated 10
amp for primary it is welland good.and if it is for
secondary it is well.
Is This Answer Correct ? | 1 Yes | 3 No |
Define norton equivalent circuit?
the max. power will be transferred if …… a) sending end vol. is high b) receiving end v is high c)…….. d) corona loss is least
2 Answers Engineers India Limited,
what is ratio test?
What are conduct on the testing in cf in ur site?
which pole motor is best ?4 pole motor or 6 pole motor,why?
how can we save enegry by using VFD for Resiprocating Air compressor which is having more unloading running hours
tate and explain super position theorem
what is the concept of star delta starter?
what happens when dc generator coupled with cycle shaft.also explain what happens when its loaded
On load tap changer (OLTC) explode? Transformer Vector group: Ynd11 Rated Power: 353MVA Rated Current: 693A Voltage:294/20KV OLTC Type: T III Y1000 110/c 12193w Max Operation Current: 295A Step Voltage: 550V Arrangement in Tx windings: Y Connection Problem: Damage of Unit 1 Generator Transformer On Load Tap Changer (OLTC) Description of Incident: 9.00 a.m. :- Generator No Load test on excitation system started 10.30 a.m :- Carried out AVR change over test 11.30 a.m :- Preparation for Generator Manual Synchronizing test 12.00 a.m :- Manual Synshronizing test started. Observed incoming generator voltage higher than running voltage. CECR operator operated Generator Transformer OLTC to bring down the incoming generator voltage 12.03 a.m :-Generator Transformer abnormal alarm operated at Gen.Control Desk (CECR) CECR operater at Generator transformer bay informed that the transformer oil splashed out from OLTC. CECR operater informed that he heard explosion inside OLTC. Observed Oil level & Oil Flow alaram operated at Tranformer local annunciator. 12.05 am :- CECR operator 'Open Gen Field Breaker” 12.10 a.m. :- Elec1 team inspected the OLTC and found the OLTC rupture disk was broken and oil spilled at OLTC area. - Elec1 found the OLTC top cover bulging. Do anyone know why and possibility cause happen in this OLTC.
Explain how you intend to work under pressure to meet up with deadline target?
WHAT IS THE USE OF STARTER AND CHOKE IN TUBE LIGHT?