How to run 1ph motor(230 VOLTS its full load amps is 4.5
ampa))with 480 volts main(we didn hav neutral)Thn we go for
step down transformer.Our load 10 amps,so we conisder this
amps in primary are secondary side



How to run 1ph motor(230 VOLTS its full load amps is 4.5 ampa))with 480 volts main(we didn hav neu..

Answer / h r jadhav

when line voltage 480 is used across the primary of step
down trf having secondary is 230 volts then 1 phase motor
will load same current to lv side however it will load the
primary with respect to tf ratio. so if u have tf rated 10
amp for primary it is welland good.and if it is for
secondary it is well.

Is This Answer Correct ?    1 Yes 3 No

Post New Answer

More Electrical Engineering Interview Questions

Define norton equivalent circuit?

0 Answers  


the max. power will be transferred if …… a) sending end vol. is high b) receiving end v is high c)…….. d) corona loss is least

2 Answers   Engineers India Limited,


what is ratio test?

1 Answers  


What are conduct on the testing in cf in ur site?

0 Answers  


which pole motor is best ?4 pole motor or 6 pole motor,why?

2 Answers  






how can we save enegry by using VFD for Resiprocating Air compressor which is having more unloading running hours

0 Answers   MRF,


tate and explain super position theorem

2 Answers  


what is the concept of star delta starter?

7 Answers  


what happens when dc generator coupled with cycle shaft.also explain what happens when its loaded

0 Answers   NTPC,


On load tap changer (OLTC) explode? Transformer Vector group: Ynd11 Rated Power: 353MVA Rated Current: 693A Voltage:294/20KV OLTC Type: T III Y1000 110/c 12193w Max Operation Current: 295A Step Voltage: 550V Arrangement in Tx windings: Y Connection Problem: Damage of Unit 1 Generator Transformer On Load Tap Changer (OLTC) Description of Incident: 9.00 a.m. :- Generator No Load test on excitation system started 10.30 a.m :- Carried out AVR change over test 11.30 a.m :- Preparation for Generator Manual Synchronizing test 12.00 a.m :- Manual Synshronizing test started. Observed incoming generator voltage higher than running voltage. CECR operator operated Generator Transformer OLTC to bring down the incoming generator voltage 12.03 a.m :-Generator Transformer abnormal alarm operated at Gen.Control Desk (CECR) CECR operater at Generator transformer bay informed that the transformer oil splashed out from OLTC. CECR operater informed that he heard explosion inside OLTC. Observed Oil level & Oil Flow alaram operated at Tranformer local annunciator. 12.05 am :- CECR operator 'Open Gen Field Breaker” 12.10 a.m. :- Elec1 team inspected the OLTC and found the OLTC rupture disk was broken and oil spilled at OLTC area. - Elec1 found the OLTC top cover bulging. Do anyone know why and possibility cause happen in this OLTC.

9 Answers  


Explain how you intend to work under pressure to meet up with deadline target?

0 Answers  


WHAT IS THE USE OF STARTER AND CHOKE IN TUBE LIGHT?

1 Answers   Siemens,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)