WHAT ARE TYPES OF STRUCTURES
Answers were Sorted based on User's Feedback
Answer / ibrahim pk
sub structure and super structure
sub structre is also the under of the ground structure.
super structure is also the top side of the earth.
Is This Answer Correct ? | 5 Yes | 0 No |
Answer / dipali
sub-structure and super-structure
load bearing structure and rcc frame structure
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / azri
simply,super structure and sub structure,below the dpc
level called as substructure and above the dpc called as
superstructure.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sudiptodas
as per structures condition
*sub-structure
* superstructure
as per construction
* frame structures
* masonry structure
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / nawin chandra jha
1) Load bearing structure.
2)Frame structure.
3) combine structure.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / mohd zubairali
sub structure (below the plinth level) like footing, neckcolumn,pcc etc
superstructure (above the plinth level)like columns beams slabs,wallsetc
Is This Answer Correct ? | 1 Yes | 0 No |
framed structure ,stub structure,super structure,
Is This Answer Correct ? | 0 Yes | 3 No |
What is the best concrete grade for raft foundation up to 1.5 meters depth?
Engineering method, why need is column kiker??? what is necessity??
If 16 mm dia hysd bar of grade Fe500 is needed in a beam but it is not available in the construction site but the beam has to cast in an emergency. Which dia of bar is to be used for for that situation? (If greater than 16 dia bar is not available at site)
if the length and breath of footing is 1.2m x 1.2 m what will be the length and breath of foundation trench
what is the size of shuttering?????
4 Answers SKV Builders and Development Pvt Ltd,
infosys campus ques... u drive a car,nmb of d car is KA17M8719. it leaves at10:26am frm davanager to bangalor which is264km away at a speed of 95km/hrCar reachs bangalor at 4:18pm. nw tel me wat is d date of birth of drvr
9 Answers Ernst Young, Infosys,
When was the first motorway built in england?
How many binding wire is use in arrangement of 25mt steel
what is mant by point of conter of fracher(p.c.f)
how would you describe yourself and your ideal job
Difference between overlap and development length of rod. Thanks.
what will happen if we use milk or oil in the place of water in concrete??????????