what are the types of footing

Answers were Sorted based on User's Feedback



what are the types of footing..

Answer / m.saranya

types of footing are
1) isolated footing
2) combined footing
3) mat or raft footing
4) strap or cantilever footing
5) continous footing

Is This Answer Correct ?    26 Yes 0 No

what are the types of footing..

Answer / hassan bin mohsin

Type of footing are
1 isolated footing
2 combined footing
3 mat or raft footing
4 strap footing
5 continous footing
6 sloped footing
7 wall footing
8 strap footing
9 stepped or pedestal footing

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

area of 8mm rod

5 Answers   INDUS,


how can calculate qty of steel required for one or two ways slabs..

1 Answers   Proscape LLC,


what is the shuttering normal clear cover for footings, walls, beams & columnms

7 Answers  


how many no of solid blocks and bricks required for construction of wall for 100 sqft?

14 Answers   Vipul,


what is the difference between mortar and concrete???

3 Answers   Indiabulls,






What is indicate Fe250 in steel structure?

2 Answers  


how much bags of cement will be in 1 cmt of having the ratio 1:3:6

7 Answers  


what is column foundation

0 Answers  


I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2

0 Answers   First American Corporation, GS Infra, L&T, Real Sociedad,


What is the role of a PMC(project management consultancy) in any construction work?

2 Answers  


How do you calculate load bearing capacity of a waffle slab?

0 Answers  


What kind of soil has what bearin for pile work? eg sand with high water table collapses faster, black cotton soil is ideal, sand leads to more wear and tear of the boring consumables, rock takes longer and require rock augers etc etc

1 Answers   HCC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)