On the transformer breather at what length should i change
my sililca gel.

Answers were Sorted based on User's Feedback



On the transformer breather at what length should i change my sililca gel...

Answer / lousy.lass

when silice gel changes to pink it should be replaced by the new one which is blue

Is This Answer Correct ?    5 Yes 0 No

On the transformer breather at what length should i change my sililca gel...

Answer / pillay

color is sure an indication of the status of the silica gel.
but deep blue is the color of dry silica gel and pale and
pinkish means the moisture content is high.at what length of
time it should replaced depends on howlong it takes for the
color change.

Is This Answer Correct ?    0 Yes 0 No

On the transformer breather at what length should i change my sililca gel...

Answer / k.prakashchandra

My answer is wrong regarding change of colour, When 50 % of
the silica gel turns white ,it should be replaced or
reconditioned.

Is This Answer Correct ?    0 Yes 1 No

On the transformer breather at what length should i change my sililca gel...

Answer / k.prakashchandra

When all turn to blue
colour
you can dry in the sun or carefully roast till the the
whole mass regains white colour and re-use

Is This Answer Correct ?    2 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

We store the d.c supply...then why can't we store A.c supply???

4 Answers  


what is appearent power?

3 Answers  


Which Motor used in Fan's Motor ?

3 Answers   Matsui Technologies,


At which conditions a synchronous motor acts as a synchronous condenser?

9 Answers   KSEB,


what happened if power factor is "1"

9 Answers   Reliance,






HOW THE OLTC TRANSFORMER SAVE ENERGY IN COMPARISON TO OFF LINE TRANSFORMER AND IS IT ECONOMICAL TO REPLACE THE OFF LINE TRANSFORMER TO OLTC TRANSFORMER

0 Answers  


In aircraft,why we use 400 htz equipment.and use common earthing

1 Answers  


WHY MOSTLY BATTERY VOLTAGE IS IN MULIPLE OF 2 LIKE 2V,4V,8V,16V,18V....

2 Answers   Exide,


The transmission does not have options: a)Partition noise b) Flicker noise c) resistance d) Short noise and reason

0 Answers  


what is meant by MCB and MCCB? and what its full form?

7 Answers   Bajaj, JHM Hotels,


Can we install and run MCCB suitable for 440v 3Phase 4wire system, on a 220V 3Phase 4Wire System.

3 Answers  


how to find the voltage's of a transmission line plzz help with pictures i am not able to understand

0 Answers   Student,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)