how we will install a positioner ?
Answers were Sorted based on User's Feedback
Answer / rameez_rz2000
1st of all we have to open the control valve 50% and then
the feed back link of positioner will came at 180 degree to
control vale and now we will adjust the screw
Is This Answer Correct ? | 6 Yes | 3 No |
Answer / rk
think positioner is nothing but a control valve.installation of positioner is done by closing the valve,then it has flange which helps to b screwed with pipes.
Is This Answer Correct ? | 0 Yes | 3 No |
how to measure draft pressure in transmitter pl. give its single line digram
what is the reason while warning lamp is on while the engine is cranking?
what is the formulae to find the thermocouple output to temperature
What is the difference between conductive lined pipe and conductive unlined pipe? Why do we see that?
0 Answers Process Control Technologies,
How find CGPA? when marks are 515/850 & 2559/3350. Plz any one tell me.
please send me the inteview questions in IOCL
list of flame proof certification ?
, Instrument Index, P&ID review, I/O schedule, datasheet, DCS / Analyzers specifications, loop diagrams, hook-up drawings.
What is the difference bitween control net scaner and device net scaner
Can we calibrate an actuator?
In apron feeder how TPH is calculated?
what is the difference between plc and pc?