Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Do these factors (settling time, peak time, steady state
error, overshoot, rise time, MPOS (Maximum percent over
shoot)) are the part of first order, second order, higher
order, linear, non-linear, open-loop, closed-loop,
homogeneous & non-homogeneous systems ?



Do these factors (settling time, peak time, steady state error, overshoot, rise time, MPOS (Maximum..

Answer / saasa

yes,igot ur point..

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

A genarator is connected through a 20MVA ,13.8/138 KV stepdown transformer to a transmission line. at the reciving end of the line a load is supplied through a step down transformer of 10MVA,138/69 KV rating .A 0.72 PU load evaluated on load side transformer ratings as base values ,is supplied from the above system for system base values of 10 MVA and 69 KV in load circuit the value of the load in generator circuit will be ...........

1 Answers  


what is ratio test?

1 Answers  


What happens to a line-frequency of high-frequency transformer when it is first energized/ re-energize?

0 Answers  


what is the purpose of CT,PT

8 Answers  


# 4 hi friends i m from electrical branch and seeking for tech. + apti. both papers of hpcl plz get it available as soon as possible my email id is sumit_lig189@yahoo.co.in

0 Answers   HPCL,


what is the difference between watts and volts?

2 Answers  


what is encoder & its use?

1 Answers   ACC,


why do we generate only 3ph ac?is it possible to generate 4ph,5ph,....?

6 Answers   Accenture, Bhel, Reliance,


Difference between ELCB and RCCB?

5 Answers  


Draw the vector diagramme for Asynchronous Induction Generator at noload,half load and fullload.

0 Answers  


What is difference between Sample test and Routine test in safety standard?

0 Answers   Chicony Electronics,


why do we need a 4th wire in 3phase 3wire transmission line

6 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)