What Is the Thumb rule to calculate depth and dia of pile
required to carry specified load on differeent soil
No Answer is Posted For this Question
Be the First to Post Answer
what is the purpose of laying PCC?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
0 Answers Vishal Pipeline And Engineering,
calculate qty of sand in 15 mm plaster for 100 sqm.
Which of the following armed forces has decided ( in August 2016) to appoint P V Sindhu ( Olympic silver medalist) as its brand ambassador? A) ITBP B) CRPF C) NSG D) CISF
Which factor affects the use of GSB material for different types of road works? What makes a material suitable to use for GSB??
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
permissible compressive strength of m15 grade conc.
Minimum no of bare in beam
Should vertical shuttering done for CC/ RCC for Damp Proof Course (DPC) be measured?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
How many jacks and props required for one floor, or tell me any thumbrule...to know the approx jacks and props required.?
What is the curing period for Epoxy grouts