What is the difference in Cement content for M-20 Concrete
if y ou use OPC & PPC?
What is the difference in the Curing Period?
Answers were Sorted based on User's Feedback
Answer / sjtbehera
OPC IS ordinary portland cement and PPC is Pozlana cement
cement. see cement used in concrete is fixed that is you
say 340 to 350 kg/cum. cement are in sane grade i.e 53. but
in PPC some amount slag are mix. so it takes some time to
hard than OPC. so curing period take more time to hard.
| Is This Answer Correct ? | 15 Yes | 2 No |
Answer / darshandachchu@gmail.com
for opc =10 days
for ppc=14 days
| Is This Answer Correct ? | 0 Yes | 1 No |
How many feet are in 4 square yards?
All aptitude question of Bechtel
What will be compressive strength of bricks , Hollow blocks, Solid blocks
14 Answers Aimil, Daewoo, EIT, HCL, Logos, Pratibha Industries,
why do you desire to change from your current position?
How much time Required for PPR pipe network testing
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
Rate analysis of Design mix concrete M50 and M60 DMRC
How to calculate the sand and aggregate in concrete
what is 43 & 53 in cement
Form where IS456 is adopted in 1978?
WHAR IS DIFFERENCE BETWEEN NOMINAL MIX & DESIGN MIX IN DETAIL
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing.
5 Answers Dee Vee Projects, L&T,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)