our factory is going under construction mean time
transformer 1000 kva 2 nos &load break swithch 12 kv & 4
nos 750 kva 2 nos & 380 kva 2 nos
generator to be errcted.how to arrange earth pits &how to
earth connect & neutral pit how to calculate in earth bit
size.
No Answer is Posted For this Question
Be the First to Post Answer
What is the possible cause for failure of lightning arrestors in outdoor substation under normal condition
is it possible to convert electrical energy to light energy for transmission purposes?
how do using transformer 30 deg lag or 30 deg lead
how the length effects the ampacity of the cable? if a cable is carrying a current of 100A for 50m length then what will the effect on current if we double the length?
R=*¶ l/a
what is field flash
WHAT CAUSED THRESHOLD VOLTAGE TO EXIST?
in three pin plug point, whats the reason that one plug point is bigger in size
whether a separate starter is used for a motor while it is connected to a vvvf panel?
How many sprinklers should be in one pipe line?
Difference between Lugs and Thimbles
Which standard we are following earthing resistance test
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)