Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How amny AH battery required for 600va inverter ?And how
many hours it will give backup for ceiling fan ?

Answers were Sorted based on User's Feedback



How amny AH battery required for 600va inverter ?And how many hours it will give backup for ceiling..

Answer / parameshwar reddy

180AH bATTERY IS REQUIRED.
IF IT IS 72W CONSUMED FAN IT WILL GIVE 30HRS. BACK UP

Is This Answer Correct ?    7 Yes 7 No

How amny AH battery required for 600va inverter ?And how many hours it will give backup for ceiling..

Answer / gaja

Baside on your required time for back up up to 15 Hours
the battery will get veries

Is This Answer Correct ?    0 Yes 1 No

How amny AH battery required for 600va inverter ?And how many hours it will give backup for ceiling..

Answer / jp

min 120AH/12V.
if we consider fan load = 72W, then it will run for 11 hrs.

Is This Answer Correct ?    0 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

What are the conditions for sustained oscillator or what is backhouse criterion?

0 Answers  


What are :- AC Distribution Board (Single & Double Front) DC Distribution Boards Distribution Board LT Breaker Panel.

0 Answers  


need of capacitor used in plant

3 Answers  


tell me about xlpe cable?

1 Answers   IOCL,


What are the test involved in DG auto synchronizing panel before in manufacturing place before dispatch.

2 Answers   L&T, TCS,


advantages of vvvf drives over non vvvf drives for EOT cranes

2 Answers  


Which material is used for the core of a transformer and why?

0 Answers  


what is the purpose of measuring % impedence?

1 Answers  


Why the Potential transformer Primary in connected to Earth?

2 Answers  


We know no of electron and proton in atom but how many Neutron are thire in an atom ?

1 Answers   Power Grid,


Different between megger and contact resistance meter

3 Answers  


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)