what is the allowable silt content in concrete?
Answers were Sorted based on User's Feedback
Answer / imran
Varies for type and use of concrete, CPWD and IS both are having conflict in it, generally we take and/or accept 8% silt by Volume after 3 hours, and 3% by dry sieving (Passing from 75 micron IS sieve). for Infra projects it is restricted for 5%.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sahil
According IS-383. Silt content by volume is 8% and by weight 15%
Is This Answer Correct ? | 0 Yes | 0 No |
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
how to calculate the quantity of plaster.
How to convert 0.44 N/MM2 in to Kgf/cm2
2 Answers Ukay Metal Industries,
How much bricks in 1sq.meter with thickness 9inch.
in M20 Mix concrete how much cement, sand and 20mm metal?
What is the meaning of RCC NP3 Pipes
for 1sft of Cement plastering ratio 1:3 How much quantity of cement and sand required.?
2 Answers CGL, URC Construction,
Hi, Please tell me the ISI specification for the duration of concrete to achieve full strength of concrete. Is it 28days?
I need old MMUP exam question and answer for Civil engineering
how to calculate the load bearing capacity of slab hos thickness and steel are already given?
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
the moisture content of the soil below which the soil volume becomes constant ie called liquid limit plastic limlt shrinkage limit none