Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


where does the hinged action while designing the strture

Answers were Sorted based on User's Feedback



where does the hinged action while designing the strture..

Answer / b.baba

at places were the bending moment is maximum, hinges will be
developed...

Is This Answer Correct ?    12 Yes 1 No

where does the hinged action while designing the strture..

Answer / viplav

in middle.

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

What is Shoe Footing ?

2 Answers   Bhandari Associates,


What is the proportion of M 45 grade of concrete

2 Answers   Payal Construction,


What are the materials used in building a gravity dam?

0 Answers  


How to get MEP technical,instaaltion & testing data for interview?

0 Answers  


in built up area basis what is ratio of concrete & steel ratio may be consider in per sqft quantity

5 Answers   L&T,


What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?

21 Answers   L&T, SSC,


What is absolute coordinates?

0 Answers  


what is the ideal construction joint for slab?

2 Answers  


1) what is the difference between development length & overlap length ? 2) why extras are provided at top and bootom in a beam of slab? 3) why stirrups are provided at 0.3l at supports and 0.4l at center? 4) is column a compression memeber if yes how & beam is which type of memeber?

4 Answers   CDS, HCC, PPL,


What is the volume of sand in per cubic meter if we have a design mix of concrete is 1:2:4 (by volume).

5 Answers  


How can we make a hole in a solid rectangle using solidsworks?

0 Answers  


Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)