Why more than one purchase organizations are assigned to
one plant?
More than One Purchase Groups makes :
1. Better Inventory Control.
2. Effective Materials management.
3. Responsible Procurement.
4. Areawise Ownership and Availability of Spares.
| Is This Answer Correct ? | 3 Yes | 1 No |
Dear friends, I got admit in one of the u.s university.I didnt take TOEFL and the university which i had applied have accepted IELTS instead of TOEFL.But i am worried whether the u.s visa interviewers will accept IELTS.please tell me your views about this problem and also suggest how to answer this question.If anyone had faced the same problem please E-mail and share your experience to me.I would be gratefull if you do me this help. Thankyou
Why normally we don’t use relay for digital input module?
What are the three managerial functions? Explain.
What is a plant layout?
what is fixed bearing?
EXPLAIN WHY YOU CONSIDER YOURSELF SUITED FOR THIS POSITION:
axial displacements of the turbine. What could be the causes?♪ ♪
What is quality management system?
why we use log files in QTP?
Why we use pneumatic instrument.
Anyone answer what is average cost for 1 meter GI pipe Hot dipping
what is the current rating of both primary and secondary of 500KVA,33KV./4ooV.distribution transformer.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)