Answer / chaitanya pithawa
because in 2nd and 4th angle,both the view is going to
overlap with each other,so we cant able to visualise the
drawing properly,so we are not drawing in 2nd and 4th angle.
| Is This Answer Correct ? | 140 Yes | 15 No |
Answer / kiran
in 1st angle projection the front view will be in the top of
the xy plane and the top view will be in the bottom of the
xy plane
.In 3rd angle projection the top view will be in the top of
the xy plane and front view will be in bottom of the xy
plane. dis will give a clear view.i hope u know dis... but
in 2 angle projection both the views(front and top) will be
in the top of the xy plane and in 4th angle projection both
the views (front and top) will be in the bottom of the xy
plane... since both the views will be in one side of the xy
plane, its not possible to draw... both views will merge...
to get more clear view, refer any basic engineering drawing
book.......
Second and Fourth Angle Projections are not used to avoid
confusion in having multiplicity of the projection usage,
and also to have a standard practice in simplifying the
drawing methods.
| Is This Answer Correct ? | 47 Yes | 5 No |
Answer / kayum
In second n fourte angle the side view n plan overlape to
each other
| Is This Answer Correct ? | 33 Yes | 15 No |
Answer / yogendra j. rane (j.t.mahajan
Consider +Y as +VP
-Y as -VP
+X as +HP
-X as -HP
First up of all clear your concept of projection method.
In simple words:
We will unable to see projections from the horizontal plane
hence we need to rotate that plane to get projections
visible (which results as +VP or -VP plane).
I am talking abaout 1st angle methos. Let you are watching
object from your right side, then you will get F.V. in
front side of +VP plane so it will be visible to you.
But you will get T.V above HP plane and which is need to be
rotated by 90 deg.
Now consider if you rotate +HP plane to anticlockwise the
projection will go to back side of +VP plane and you will
not be able to see them, but if you rotate it clockwise it
will be in the front side of -VP plane which is in front of
viwer.
Try this basic logic/method to every quadrant/angle, you
will get ans to your question.
| Is This Answer Correct ? | 10 Yes | 2 No |
Answer / deepak kumar(yadav)
there are four angle i.e 1'st,2nd,3rd &4th.in fist angle we m
ove anticlock wise in 90degree(the rule is that horizontal line move in anticlock wise direction).so we make drawing in 2nd quardent.In second angle we move 90degree in clockwise direction,but if we move 90degree in clockwise direction it cause overlap due to this reason we never make drawing in second angle(the rule is vertical line moves clockwise),in 3rd angle we move 90degree anticlock(as per first quardent rule),so we make drawing in 3rd qurdent,IN 4TH quardent we move clockwise in 90degree it cause overlap due to this reason we never make drawing in 4th quardent.
| Is This Answer Correct ? | 10 Yes | 10 No |
Answer / saqlain
Tin 2 and 4 angle of projection the top and bottom veiw are overlap each other and drawing are mixed their for we not used its
| Is This Answer Correct ? | 0 Yes | 0 No |
What is meaning of due point in air Compressor system?
Define heat transfer?
as started in the job offer notification, is our basic salary of 1lakh good for you if employed?
• Tell me more about your experiences in this qualification and since when you have been working on this profession till date?
If I import a steam boiler from USA and want to install it in India, will it work ?
What are the causes of liner high temperature?
draw p-v dia distingshing naturally aspirated and supercharged engine with reference to pumping loss?
a cylinder, which length is 750mm and dia meter is 200mm, so find out a volume of cylinder ?
If mft not act when spark failure 3 time what problem will happen in boiler side
How to find the amount of natural gas required to produce 1kwhr of energy?
SIR, PLZ GIVE ME INFROMATION FOR WRITTTEN TEST AND PI IN ISRO AHMEDABAD (MY MAIL ID:-ppdave@yahoo.com)
1: When mesuring the flow of liquid what are the two things to measure? 2: In which industrial process you will use centrifugal separator? 3: If any machinery or transmission needs periodic and regular lubrication what is the best method to give it? 4: Oil melts, grease melts. Is there any other lubrication which is effect at 200 deg c? 5: What is a torque converter? 6: Instead of having individual transmission what is the benefit of unified transmission? 7: What are the different types of mechanism to engage primary moving engine and transmission (in other words how many different types of clutches are there)? 8: In order to ensure constant pressure and constant flow rate of compressed air what should we put between the compressor and end user? 9: What can be the reasons for a metal gasket to leak? 10: The old welding machines used electromagnetic winding to step up the current for welding rods. What is the new principle inside the welding machines?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)