Do u know epicyclic gear box?What are the pratical
application of epicyclic gear box?
Answers were Sorted based on User's Feedback
Answer / karthick
hand watch is the best pratical example for epi-cyclic gear
train
Is This Answer Correct ? | 23 Yes | 1 No |
Answer / pvss
Helicopter Main Gear Box...About 12000rpm is reduced to 192
rpm. epicyclic gear box is used for that kind of rpm
reductions, while consuming very little place.
Is This Answer Correct ? | 15 Yes | 1 No |
Answer / maria ambrose raj
Epicyclic gear box is a gear box in which all the axis of
gears will not be fixed.some axis of gears may revolve or
rotate , this type of gear box is mainly used for get high
gear ratios. (ex)differencial in automobile.
Is This Answer Correct ? | 5 Yes | 7 No |
AS WE KNOW THAT TODAY VEHICLE R COMING IN MARKET WITHOUT CARBURATOR. IN THIS SITUATION HOW DOES THE ENGINE WORK.
thermal engg
what is the reasson after complitation of suction stroke and started comperation stroke inlet valve open for few digrees
What is the difference between IES and Engineering service exam?
What are some examples of a periscope?
why the wear of back tyre takes place more rapidly than front?
what is breather i a diesel engine. state its function.
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
What is big advantage of fast breeder reactor ?
what is the difference between impact force and sudden force? pls give any example.
why are using ahu?
How a main gate (steel) get support from top whlie slides on the rail fixed on the bottom surface??