why the generator will take 8 to 12 hours to start after it
got interrupted due to technical problems in case of power
plants.
Answer / venkatesan.j
In a thermal power plant the prime mover is a steam
turbine. In order to obtain the rated speed in a turbine it
takes about 4 to 6 ours depending upon the type and
capacity of the turbine.
| Is This Answer Correct ? | 3 Yes | 4 No |
working principle of AC Servo Motor with its construction
Two bulbs of 500w and 200w rated at 250 v will have resistance ratio as ?
2 Answers CGL, Dreamz Infra, Sunny Developers,
i am trying to PSUs/govermeant jobs since last 2 years but still i m not success, plz help me.
Please tell me the power flow from pmg to main rotor of an alternator (Including AVR unit)?
why maintain the Dg PF is 0.8? Explain?
WHEN SINGLE PHASE SUPPLY AS 220V, WHY THE 3 PHASE- 4 WIRE MEASURED AS 440 VOLTS INSTEAD OF 660 VOLTS (220 VOLTS PER PHASE i.e 220x3 = 660 volts ).
What is a feedback in control system?
what is over cureent protection
What is the difference between amorphous core transformer and CRGO core transformer?.
which type of motor is suitable for water pump?
What is thresh hold value of current?
what is the burden?accuracy?Knee point voltage? what is the Alternator of PGM?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)