# 1. Size of slit content in sand.
# 2. Gravity of sand
# 3. Water observation capacity of sand.
# 4. minimum crushing Strength of sand.
Answer / suresh
it is not specified in the relevant code (IS:383) about
silt content, instead it is said that the particles finer than
75 micron.it should not be more than 3% in natural or
uncrushed sand whwre as in crushed sand it is allowed upto 15%.
the gravity of the sand varies from 2.6 to 2.8.generally taken
as 2.65.
water absorption capacity of the sand varies between 0.5 and 1%.
the minimum crushing strength of sand or aggregate should be
80 N/mm^2.
Is This Answer Correct ? | 7 Yes | 0 No |
how many no of light weight solid blocks of size 600x200x200mm required for 1cum of block work
Hi Dudes, I have completed B.E Civil with two years experience in Highway& Bridges. One year experience in Site field & One year experience in Planning & Billing Dept. I am willing to work in abroad, i am having passport and all..So if anybody knows about foreign vacancy pls inform me..Ph:9994050979 & Mail Id: Simacivil1988@gmail.com
What is the cost difference between site mix and ready mix concrete per cubic meter
Mujhe koi ye bta do ki 1.54 hi ku lete h material ki quantity niklne ke liye Sab jgha dhund liya bt samj nhi aaya mujhe koi alag aalag krke smjao ki cement m aggr. Dust m itne % wet or dry % hoti h fir kaise kaise 1.54 aaya kha se aaya smjao koi pls m confuse hu my calling nd wts app no. Is +919034604938
What is the role of a PMC(project management consultancy) in any construction work?
what is the weight of 1 meter iron road if its diameter is 20milimeter. 2.when we find the weight of 1meter iron road we help the following formula dxd162 .what is 162 plz tell me
What is the quantity of cement, sand, and gravel to be used in M20 grade of concrete for 1000 x 1000 x 1000 mm of sand (for cement please mention in kilos, and for sand and gravel please mention it in CFT)
Define what is quality...
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
what is cement mortar cube size and strength in 3days, 7days and 28days