Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) If I want to use capacitor banks at HT (11 KV) side for maintaining power factor then which type of capacitor should I use? Plz give me the specification?? (I am using 1250 Kva transformer (11 KV/433V)).
2 10697what is MFD value in capacitor?I have 201 Kva load & reactive power is 150 Kvar. so how it is calculated?
IIT,
2 9429
What are the phases inspections are done by local authority while construction?
Please mail me the Satyam Computers (Mechanical Division, Satyam Technologies, Hyderabad & Bangalore) question papers on Design & strength of materials. Will be very thanksful.....srinivas_1704@yahoo.co.in
Do you have recombinant protein expression experience? Explain?
where is the need for short circuit test for 3 see is required and why? can you explain in brief with application
I want to know the 'Test voltage' for Tandelta testing of 3.3 / 6.6 / 11 KV Motors. Please explain
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
Define noise?
On what basis the the size of Lightning arrester for buildings are selected ?
How can we derive power factor equation p=vi cos phi?
how does polarised capacitor works?at which situation in circuit it is used
How to find permissible diagonal tensile stress in reinforced brick work
What is oscillator circuit?
Which is the pin no of CN1 TERMINAL and the parameter using in delta servo drive for auto/man input and start forward input
Whar is the KvA rating of 33Kv substation & actual kv rating of power generaating station.
i have applied for junior engineer 2 c&w for Guwahati RRB please send me last five year question paper