Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) need help, please can someone tell me how can i calculate the main breaker and branches breakers to distribution panels (MDB) depending on the load ampere .. i really need it but can't find any site >>
3 4659Why the Air Tank Accumulators required for the single acting actuators SDV's or BDV's as I see in some Schematic diagrams of ROTORK ??
2 11222What is maximum permissible length of cable from transformer (33kV/0.433kV) HT side to HT panel which contain VCB? In which standard i shall get this information.
MSEB,
6 16601in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
2291
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
Convert a star connected network into a delta connected network.
Explain the significance of the angle of repose holds in the chemical industry?
Why acetic acid is used in enzyme bath?
why we are using register of 1k,10k,100k,47k,330k in cell phone based voting machine project?
Why can't we use antifrictional bearing in place of journal bearing in a 660mw plant
what is the difference b/w ground & virtual ground?
What is meant by optimization and what are different ways of optimiztion?
what is associate law?
Mention the disadvantages of low power factor? How can it be improved?
if any body have tyco electronics placement papers,please forward to my mail id kadhar.basha@gmail.com ,please as early as possible. thanks®ards kadhar basha
Dear all, i completed M.E(Power Electronics & Drives) 2011 passed out having 78% so i need job in core side but i don't know how can i receive the calls from electrical companies and i uploaded my CV in naukri, times jobs etc.. In that iam not recieved any mails from good companies so give me best procedure plzzzzzzzzzzzzzzzzzzzzzzzz..... Thanks, K.Linga Reddy Email-id:-lingareddykmthm@gmail.com Ph no:-08015402078
What is an asic?
How to work definite,over pluxing,revers power,OSR relay
what is the input of digital counter during the the calibration time?