On what basis is the Acceptance plan prepared?
No Answer is Posted For this Question
Be the First to Post Answer
The company has software running in its production environment that was designed and tested on its quad- processor servers with 16 GB of RAM. In order to meet budget constraints, its disaster recovery plan calls for this same software to be installed on functionally identical servers, which are dual-processor with 12 GB of RAM. The test group has been tasked with confirming that the software is going to work on the hardware proposed in the disaster recovery plan. -what testing types is being used in the scenario above?
Explain V model in depth?
If there is requirement After 6-7 months from client such that "Apply Shortcut keys[keyboard keys]to all buttons on all the screen. And If test cases are written for the buttons then Again we have to write test cases for Shortcut kays
What is known issues?
3 Answers Mantra Media, Yardi,
what are the document needed to create a test case?How u tell it is test case?
what is spiral model?
how The engineer communicates wiht T.L as well as test manager, In wich situation this type of i mean serious commnication takes place(give me one real time example).and how the interaction will takes place between tester and client can anybody plz clatify me.
i am fresher in manual testing.how to do database testing.
If any feature is removed from the application then also tester have to do Regression testing?
What is the difference between Use Case and test case?
The degree to which the software LOC of a program has been tested is called A.Data flow testing B.Code coverage C.Code walk through D.Statement coverage
what is the part of qa and qc in refinement v model.