How often you do the load test in your current project?
Answers were Sorted based on User's Feedback
Answer / ravi v v
This also depends on the Project / application demand.
For Example if the application is like depends on the Data
that is going to change every day with heavy fluctuations.
Then we will keep certain time period (say 30 days) we will
test the LOAD during these 30 days on every day to moniter
the performance behaviour of the application.
| Is This Answer Correct ? | 2 Yes | 0 No |
In which doc do client give the VUser limit & Parameterization?
What are the drawbacks of LoadRunner tool?
What is SoketLevelData? And Its purpose?
Does the Tool generates think time for the standard value defined in script with respect to server response when we use option use random think time 50 - 150%. or will tool simply calculates value randomly for the standard think time defined in script.
What is maximum No of Vusers that we can load using LoadRunner8.0 and how should we connect to database using loadrunner
What is the load runner testing process?
What is the relation b/w Throughput and Hits Per Seconds (H/S)?
Hi all, I am new to Load Runner. I have run the load runner and i got analyzed reports/graphs. But i am very much confused about how to analyze those graphs. Can any one help me out this problem?
WHAT IS AUTOMATION TEST FRAME WORK
How to schedule a scenario?
Events are generated, but the script is not generating? Why?
Why do you create parameters?