How often you do the load test in your current project?
Answer Posted / guru
Hi,
Load Test is ideally done only once, and only after all
the Functional Testing (UAT/SIT).
Otherwise, i could depend on your client requirement.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is ms-windows?
What are the different sections of the script? In what sequence do these sections run?
What is local configuration file?
What are the three sections of a vuser script and what is the purpose of each one?
How can performance bottlenecks be identified?
How many users can I emulate with loadrunner on a pc?
How can you test the global servers with using loadrunner
What are the types of checkpoints is available in loadrunner?
How you edit the script?
How does caching affect performance testing results?
Which function is used to end a nested transaction?
How to identify what to correlate and what to parameterize?
What tools are required to analyze vuser run results?
What is the need of checkpoints in lr?
how to add 100 for dynamic(correlate value) value