How often you do the load test in your current project?

Answer Posted / ravi v v

This also depends on the Project / application demand.

For Example if the application is like depends on the Data
that is going to change every day with heavy fluctuations.
Then we will keep certain time period (say 30 days) we will
test the LOAD during these 30 days on every day to moniter
the performance behaviour of the application.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the different sections of the script? In what sequence do these sections run?

753


What is the difference in running the vuser as a process and as a thread? Which is more advantageous way of running vuser?

599


How will you stop the execution of a script on error?

630


Difference b/w 9.1 and 9.5 Versions in LoadRunner?

6370


How will you divide your script into multiple actions? Why?

785






What are all the reasons to use the server resources monitor?

546


You have an application which shows the exam results of the student. Corresponding to name of each student its mentioned whether he passed or failed the exam with the label of “pass” and “fail”. How will you identify the number of passed and failed student in vugen script?

691


How can performance bottlenecks be identified?

624


What is vuser script?

644


When loadrunner is used?

655


What is the latest version and language used in load runner?

629


What is the load runner testing process?

584


What are monitors?

606


what are the skip functions in Load Runner?

1798


What are the four selection methods when choosing data from a data file?

715