what is the entry & exit criteria of testing process?
Answers were Sorted based on User's Feedback
Answer / gajanan
Entry Criteria:
1 All code of application, unit tested.
2 Test plan, test cases revieved and approved.
3 QA/Tester get significant knowledge of application.
4 Test environment/test ware get prepared.
5 After getting application build.
Exit Criteria:
Deadlines (release deadlines, testing deadlines, etc.)
Test cases completed with certain percentage passed
Test budget depleted
Coverage of code/functionality/requirements reaches a
specified point
Bug rate falls below a certain level
Beta or alpha testing period ends
Is This Answer Correct ? | 102 Yes | 11 No |
Answer / prachi
Entry and Exit criteria is required to start and end the
test cycle.
E.g. The entry criteria defines what all need to start the
testing.
- Business requirement should be cleared, confirmed and
approved.
-functional requirement should be cleared, confirmed and
approved.
- Test Envirnement should be ready
- Test cases to be executed should be ready
- Application to be tested should be ready
- Resources should be ready
Exit criteria will include what all required to end the
test cycle
- All business functional requirements are met
- All defects are fixed or closed
- Closure reports are singed off.
- All the test cases have been executed and passed
- Budget allocated for testing is exausted.
Is This Answer Correct ? | 38 Yes | 3 No |
Answer / sankumarsingh
Entry and Exit criteria is completely task dependent. Means, it depends on what task you need to do or you have to perform.
In general, entry criteria is a set of conditions that permits a task to perform, or in absence of any among these condition will not allow to perform that task is taken as the Entry Criteria of that task.
E.g. If you have to write Testcases, what you will required to do that,
1. The requirement doc,
2. Complete understanding of the flow,
3. The testcase format/Tool that is used in your organization
and many more
Simillarly if you need to execute TCs the Entry criteria should be
1. The test cases,
2. Environment should be set
3. Test data should be available
4. Availability of application etc....
The Exit criteria is a set of conditions based on which you can say this particular task is finished.
E.g. System Testing
1. The requirement should be completely covered.
2. The Sev2 and above issues must be fixed.
3. The documentations must be done for that application and so on...
Is This Answer Correct ? | 9 Yes | 1 No |
Answer / vinod
For each and every phase of testing we have one exit and
entry creteria.
For example:
While completion of unit testing there an exit creteria for
unit testing and entry creteria for next level of testing.
Is This Answer Correct ? | 15 Yes | 14 No |
Answer / manasa
Required conditions and standards for the work product
quality that must be present for the entry into the next
stage of the software development process.
Is This Answer Correct ? | 24 Yes | 26 No |
Answer / vamshi
or each and every phase of testing we have one exit and
entry creteria.
For example:
While completion of unit testing there an exit creteria for
unit testing and entry creteria for next level of testing.
Is This Answer Correct ? | 5 Yes | 8 No |
what is requirements review process? Can anyone please explain me? Thanks, Prasanna
What is Defect Density ? What is the formula? Explain with example
At wht stage in the SDLC testing should be started?
What is the term for decomposing a software program so that latent design information can be extracted? Choice 1 Regression Choice 2 Restructuring Choice 3 Reusability Choice 4 Reverse engineering Choice 5 Reengineering
4 Answers Brainbench Certification,
What is destructive testing?
how can we explain for "what is STLC(software test life cycle)
If every alternative letter starting from B of the English alphabet is written in small letter, rest all are written in capital letters, how the month "September" be written. (1) SeptEMbEr (2) SEpTeMBEr (3) SeptembeR (4) SepteMber (5) None of the above.
what sort of things what u put in Bug Report ?
What is severity and priority?Give some examples of severity and priorty and high severity & low priority and viceverse and also explain each.
22 Answers HCL, IBM,
What is Project Planning? how we can do the same? Is there any tool we can use for the same?
How would you test an ATM Machine?
What is Pesticide Defect?